The Project includes the construction of multiple structures, including a greenfield manufacturing facility (Fab), Gas Chemical System Building (GCS), Central Utility Building (CUB), and more. Our expertise in structural steel detailing facilitated the seamless integration of these diverse structures, ensuring optimal functionality and durability across the entire manufacturing complex, including personnel and material handling links and associated site infrastructure.