Magellan Midstream Partners LLP is a company that primarily transports, stores and distributes crude and refined oil products. They own 2000 miles of crude oil pipeline and 9800 miles of refined product pipeline. This job was a part of the huge pipeline and storage development in Pasadena. This facility developed at the cost of $820 million handles petroleum products and includes storage for five milllion barrels, truck loading facilities and two proprietary ship docks. The project is jointly developed by Magellan and Valero. The job involved detailing of the Three Bay Truck Rack Support Steel, Truck Loading Rack Drain Pipe, Cable Tray Support system, Biodiesel Building, Stair and Handrail for Pipe Rack, Fire Authorisation Building and Additive Tank Area.